PE pipe before use, should do the full preparation

2024-04-24

Size

PE pipe fittings are widely used in the construction industry, which is because of the good advantages of PE pipe fittings, but before the use of PE pipe fittings, should be well prepared to avoid any problems later.

In the installation of PE pipe fittings before the need to dig a trench, and digging a trench is dug out of the soil to have a reasonable place to pile up, and can not be too close to the trench, there should be a distance of more than two meters. And the excavated earth should be transported to the outside in time, so as not to affect the future work. In the construction of PE pipe fittings, must use mechanical operation, with mechanical digging to the design of the bottom of the trench elevation above twenty centimeters can be, the rest of the part can be asked to workers to dig.

In order to ensure the safety of construction, construction period and the quality of construction, before the construction of the construction of the lot must be fully understand and investigate the soil quality, water table, etc., so as to ensure that there will be no accidents in the construction!

Key words:


Message

We will contact you within one working day. Please pay attention to your email.